Sunday, October 28, 2007

Wright

My digital camera is not working correctly, so I'm having to use my phone camera.
I'm 3 1/2" into the armhole of this pullover. I'm ready to start doing the increases.

Saturday, October 27, 2007

Different

I decided to make a quiche today, since it's my favorite food and I have difficulty getting it at restaurants around here. This is broccoli, chicken, and cheddar cheese quiche.

Sunday, October 21, 2007

Bolster End

One end of the bolster pillow cover is finished. The above picture is to show the color. The picture below shows the detail better, but the color is not as good. I had to use no flash in order to get the detail to show up.



I've been thinking. I would like for the cover to be removeable so it can be washed. So, I'm going to have to come up with a plan for the other end to make it removeable. In the meantime I think I'll start the Tree Jumper.


Friday, October 19, 2007

Inspiration


This marvelous sweater is being worn by a co-worker of mine. She got it at some trendy store in northeast Wichita. The second I saw it, I wanted to make it. She graciously let me take pictures of it so I can try to create the pattern. Actually, I don't think it would look so good on me (without some adjustments) but it made me think of some of my knitterly friends. ;)


Thursday, October 18, 2007

Pillow Cover Progress

I've been trying to focus on working on only one project at a time. We'll see how long that lasts. Here is the progress on the pillow cover. It's getting a little boring, but it shouldn't take too much longer and then I can do the ends.

Saturday, October 13, 2007

Catch Up


It's Saturday and Cooper wouldn't let me nap, so I took pictures of my WIPs.



Wright pullover pattern from Berroco in Berroco Love It yarn in a beet color.



I'm making the bolster pillow cover (the lower one on the right). This pattern is in the Fall 2007 Knitting Universe Knitter's magazine. I'm using Berroco Comfort in two shades of green.


Cookie's Hedera sock pattern. The progress on this project has been very slow.



I'm making some black gloves for my supe for Christmas.





Queen of Cups socks with Opal yarn. I like working with the Opal and it has been going smoothly. However, I had to put this project on hold in order to finish the Halloween cardigan. Now that I got a fresh taste of finishing something, I want to do it again, so have been working on the pillow cover. It could be the fastest project I have going. But, I bought a new pattern today . . .




Monday, October 08, 2007

Finished Halloween Cardigan


Here it is, the finished Halloween cardigan. It's a little snug, but wearable. It hasn't been blocked yet.


That's some weird kind of moon shape, isn't it?







I'm sure glad this is done!


Wednesday, September 26, 2007

One Sleeve On


The pumpkin sleeve is sewed on.
Next is weaving in the candy corn ends.
I'm beginning to think this is yet another sweater that is too small for me. I guess I don't realize how big I really am. Maybe I'll make another one - in the right size . . .

Saturday, September 22, 2007

Halloween Checkerboard

It's not perfect. Oh, well, maybe no one will notice.
Finishing weaving in ends is next.
I'd rather be working on the Wright sweater or the bolster pillow cover or a pair of socks.
I ordered the Rusted Root pattern from Zephyr Style because I saw one finished today at my LYS, Twist. (Some day I'll put that button on my blog.) I thought I was supposed to get an email about how to download the pattern, but I haven't yet. Maybe that's what my white yarn wants to be.
Took Cooper for a drive in my car this evening. She puked - a lot. I won't post a picture of that.

Monday, September 17, 2007

Halloween Upate

I can't believe it's been since last October that I posted any pictures of the Halloween cardigan! So, here it is with all the pieces finished.



The sleeve with pumpkins will be on the left.


The right, candy corn sleeve.
Now, I just have to weave in some loose ends. I suppose I SHOULD block it, since it's cotton and wool Cotton Fleece. I've never really understood Blocking, but I've tried it a few times just because I thought I was supposed to. It's never seemed to help. I'm open to suggestions.


Sunday, August 26, 2007

Love to . . .

bead about knitting.



I just finished this bracelet.
Now, maybe I should get back to my knitting.


Saturday, August 25, 2007

Hedera


I worked on my Wright sweater a little bit today, but I also bought yarn to begin a pair of socks. The yarn is Lang Jawoll in Black. The pattern is Hedera from Knitty. I'm using size 1 dpn.
I should be working on the candy corn sleeve. I got some rows done on it and then I decided to make a change, so I'm at the point of needing to start over. I just don't want to!
In addition to the Wright sweater, I've also started a simple sleeveless top in white cotton.
I recently became frustrated with the heel on the second sock of my first pair of toe-ups. I bagged it all up and put it away, planning to frog both of them and do something different. At this point, I never want to do a toe-up sock again.

Tuesday, August 14, 2007

The Wright Sweater

Okay, so I didn't follow through on the small socks. I wasn't pleased with how the first one turned out. I didn't really want to make another sock that I didn't like just to match the first one. I could have made the second sock fit better, but then I would have had to make a third one. And the little guy went back home to California. It was just too much pressure.
So, I started a new project.



Here is the link: http://www.berroco.com/exclusives/wright/wright.html

I'm using Love It yarn from Berroco, purchased at Twist www.twistyarnshop.com and so far it's living up to it's name! The color name is Borscht. I think it has something to do with beets.

I didn't knit a swatch for this project. I blame The Yarn Harlot for that. I'm doing this one intuitively. I'm hopeful for a better fit this time.

Tuesday, July 31, 2007

Small Socks


I wasn't going to do it, but I gave in and said I would make Gabe a pair of socks. How could I resist? Every time I worked on my own socks, he would ask if they were his. So now I'm working feverishly because he leaves Sunday night to go back home to California. I'd at least like to get one done before he goes, so I can be sure of the size. Then I can use my notes to make the second one.




Monday, July 23, 2007

Finished Monkeys

Yippee yay yay I finished my first pair of Monkey socks! Gonna wear 'em to work tomorrow. May even walk in with my pants rolled up so everyone can admire them.

Saturday, July 21, 2007

Tulip Brigade

I recently discovered this pattern, designed by Stephanie Pearl-McPhee. It occurred to me that a bunch of the KIPsters could make these socks and wear them when Stephanie visits Wichita. I can see it now, all of us gathered together in the midst of the other 300 people there to see the Yarn Harlot. Oh, but how will she know we're wearing her socks? I guess we'll all have to synchronously stand on our heads and wiggle our feet. But, then the tulips would be upside down . . .
In other news, I'm about halfway done with my second Monkey sock. I haven't been able to take any pictures all week because my camera has been traveling in California. She returns today.
When I finish this Monkey sock, I will continue working on the toe-up socks I started for the local sock class recently. The colorway doesn't seem to have a name, just a number, 5440, or something like that. I call it Strawberry Parfait. I don't know what I'm going to wear them with.
I recently purchased a pair of pants to go with the Monkey socks. I'm not sure what the actual color of them is, but I call them dark khaki. They don't exactly match the brown in the sock yarn, but I think it'll work. I looked through all of my blue tops and found one that I think matches best. I call it periwinkle, but others call it purple. So, we'll see how this non-matching outfit works.

Saturday, July 07, 2007

Standing

I took this picture of Cooper this evening, so you can see how big she's getting. I had to put a puppy snack on the counter to get her to stay up there long enough for me to snap the shot.

Thursday, July 05, 2007

Counting the Days

I worked a little bit on the Jack-O-Lantern sleeve of the Halloween cardigan yesterday. I have 88 days to finish it before October. I need to finish this first sleeve, design and knit the Candy Corn sleeve, add the front button bands, sew the seams, and figure out how to put the ruffle where I want it. I may have to work on this every day in order to get in done in time. Why did I procrastinate?!

Plus, I've found a Halloween socks pattern that I want to make really badly. I'm going to have to re-chart it, though, in order to use the type of yarn I want.

Wednesday, July 04, 2007

Monkey Sock

This is my first Monkey Sock, at the end of the heel flap. I've actually finished the heel since I took this picture. It's going very easily and I can believe Lia when she says they're addictive.

Saturday, June 30, 2007

Cindy is Finished


She's actually been finished for a few weeks now. She's a little too snug for me to feel comfortable wearing her. Another knitter expressed interesting in purchasing her from me, but she turned out a little too snug for her, too. So, I guess I'll have to use her as an incentive to lose some weight. I am pleased with how she turned out. The quality seems a little better than some of my other tops.